Hydraulic Press Machine Operation and Installation Tutorial
You are here: Home » Showroom » Video Gallery » Hydraulic Press » Hydraulic Press Machine Operation and Installation Tutorial

Hydraulic Press Machine Operation and Installation Tutorial

Views: 44     Author: Site Editor     Publish Time: 2022-07-29      Origin: Site

Inquire

Main features

Hydraulic Press Operation and Installation Tutorial

Oil Pipe Connection.

Connect the up pipe of the main cylinder.

Connect the downpipe of the main cylinder.

Connect the downpipe of the ejection cylinder.

Connect the up pipe of the ejection cylinder.

Connect the prefill valve of the main cylinder.

Wire Connection.

Open the electrical cabinet.

Connect to the three-phase power source.

Fill The Oil.

Unscrew the oil filling port.

Add Number forty-six antiwear hydraulic oil.

Operation Process.

Turn on the power.

Wait for the system to load.

Tap the screen to enter in.

Choose the language.

Click the button SERVE start and stop.

Place the prepunched sheet into the die.

Press the Main Cylinder Push and hold.

The slider is pressing down.

Press the Main Cylinder Return and hold.

The slider is returning and up.

Take the product.

Product Demonstration.

Video

  

Get A Quote
Home
Copyright  2023 Nanjing Harsle Machine Tool Co. Ltd. All rights reserved.