Select upper and lower molds
Views: 68 Author: Site Editor Publish Time: 2023-08-15 Origin: Site Inquire
Fill The Oil and Cable Connections
Filling the oil tank with anti-wear hydraulic oil. And fill the oil from this port.
No less than 2/3 of the Oil Volume Level.
Connect the machine to the power source. And connect to a 3-phase power source.
Switch on the power source.
Connect the pedal switch to the machine.
Turn on the power switch.
Check the main motor rotating direction.
If it rotates clockwise, then It is correct.
If it is rotating anti-clockwise. And press the emergency stop.
Exchange the two wires connection.
Machine Start-up
Turn on the machine power switch.
Waiting For the System Loading
The machine will find the reference point automatically.
Start the oil pump
CT12 Operation
Select Graphic Programming
Select upper and lower molds
Input the sheet length of 1000
Drawing according to the product and entering the length in order.
Tape the corner to edit its angle
Edit the bending sequence and simulate
Rename and save the program
Bending
click on the button and run
Placing the metal sheet. And the sheet will touch the stop fingers.
Step the foot pedal.
Complete the four steps in sequence.
Measurement & Calibration
Measure the first bending distance
Measure the second bending distance
Measure the angle
Error was found, the actual bending angle is 89 degrees
Click on the icon
Click to calibrate
Input the actual measured angle
Calibration completed
Bend again for testing.
Measure again.
It is correct now.
Switch Off
Step the pedal switch to lower the punch against the die.
Press the emergency stop buttons.
Turn off the power switch.